The municipal permit process is notorious for its complexity and unpredictability. Our expediting services transform this bottleneck into a streamlined, managed workflow.
We do not simply submit documents and wait. We actively manage your project through every departmental review — Building & Safety, City Planning, Fire, Public Works, and Health. By understanding the specific expectations of each department, we format and organize your submittals to pass initial screening without friction.
Project Assessment & Feasibility
Before a plan is drawn, we review your project scope, zoning, parcel history, and applicable overlays — Coastal Zone, Hillside Ordinance, HPOZ, Very High Fire Hazard — to confirm the permit type required and identify complications early. Catching a CUP trigger or coastal jurisdiction issue before architectural drawings are complete saves months.
Pre-Submittal Code Review
We review draft plans against the Los Angeles Municipal Code, California Building Code, and applicable local amendments before submittal. Setbacks, height limits, lot coverage, parking ratios, accessibility compliance, and Title 24 energy requirements are all verified. Corrections at this stage cost days; corrections after LADBS submission cost weeks.
Application Preparation & Packaging
We prepare the complete submittal package to LADBS formatting standards: architectural plan sets, structural drawings and calculations, Title 24 energy compliance reports, soils reports (where required), MEP drawings, and all agency-specific forms. An incomplete package resets your plan check clock before the clock even starts.
Submittal & Active Plan Check Tracking
We submit through LADBS's PIMS portal or over-the-counter at the appropriate district office — Metro, West LA, Van Nuys, South LA, or East LA — based on project location and permit type. We track status daily, communicate directly with assigned plan checkers, and escalate stalled reviews proactively.
Correction Response & Resubmittal
When plan check comments are issued, we analyze each item, coordinate the required revisions with your design team, and prepare the resubmittal package. Most experienced expediters resolve plan check comments in one resubmittal round; inexperienced applicants routinely take two or three, adding 4–8 weeks per cycle.
Clearances, Fees & Permit Issuance
Once plan check is approved, we manage all required departmental clearances — City Planning sign-off, LAFD approval, Bureau of Public Works, Bureau of Sanitation, and any applicable overlay agency. We coordinate fee calculation and payment, then confirm permit issuance and deliver the approved set to your team.
Most projects in Los Angeles require coordination across multiple agencies simultaneously. Running these processes sequentially — the way most applicants approach permitting — adds months to project timelines. We run them in parallel.
LADBS
Los Angeles Department of Building & Safety
Primary plan review for structural, architectural, electrical, plumbing, mechanical, energy, and accessibility compliance. Operates through district offices across the city; plan check assignments and timelines vary by district and current backlog.
City Planning
LA Department of City Planning
Land use entitlements, zoning verifications, Conditional Use Permits (CUP), Variances, Zone Changes, and CEQA determinations. Required pre-clearance before LADBS plan check on most entitlement projects.
LAFD
Los Angeles Fire Department
Fire life safety plan review covering sprinkler systems, egress, occupant load calculations, hood suppression systems, and access requirements. Separate from LADBS; runs concurrently with building plan check.
Public Works
Bureau of Engineering / Public Works
Street improvements, sidewalk compliance, driveway approach permits, sewer connections, and stormwater management. Common source of unexpected delays on commercial projects.
Health Department
LA County Department of Public Health
Food facility plan review for commercial kitchens and restaurant buildouts. Operates separately from LADBS with its own submittal requirements, forms, and pre-operational inspection schedule.
Coastal Commission
California Coastal Commission
Projects within the California Coastal Zone — roughly within 1 mile of the Pacific — require a Coastal Development Permit (CDP) in addition to LADBS permits. CDP review adds 2–6 months depending on project scope.
HPOZ Board
Historic Preservation Overlay Zone Board
LA's 30+ designated HPOZs — including Hancock Park, Windsor Square, Angelino Heights, and Carthay Circle — require a Certificate of Appropriateness before LADBS issues a permit for exterior alterations. Adds 4–8 weeks.
Timelines below represent well-managed projects submitted with complete, code-compliant packages. Incomplete submittals, unresolved overlay clearances, or multiple correction cycles extend these ranges significantly.
The specific documents required depend on project scope and permit type. A standard commercial tenant improvement or residential addition typically requires:
Site plan, floor plans, exterior elevations, building sections, and construction details — formatted to LADBS standards including title block, plan dimensions, and scale notation.
Signed and stamped structural plans with seismic, lateral, and gravity load calculations. Required for any work affecting structural elements, new additions, or foundations.
California energy code compliance documentation, including a CF1R and supporting HERS forms for residential projects and a Form 540 for commercial buildings.
Required for new foundations, grading work, or additions in hillside areas. Must be prepared by a licensed geotechnical engineer and reference the specific parcel APN.
Mechanical, electrical, and plumbing drawings. Scope varies — a simple TI may require only electrical; a restaurant buildout requires full MEP including hood exhaust and grease interceptor sizing.
LADBS permit application, owner authorization letter (if applicant is not the owner), City Planning referral forms, and any supplemental agency applications (Health, Fire, Public Works).
The majority of permit delays in Los Angeles are preventable. These are the most common causes we see — and the reason a pre-submittal review is worth the time.
Incomplete Plan Sets
Missing required sheets, inconsistent dimensions between plans, or drawings not formatted to LADBS's current standards. Plan checkers flag incomplete packages before formal review begins, resetting the queue.
Incorrect Permit Type
Applying for a Standard Plan Check permit when the project qualifies for an Express or Over-the-Counter pathway — or applying OTC for work that requires full plan check — wastes weeks at the front end.
Missing Pre-Clearances
Submitting to LADBS without first obtaining required clearances from City Planning or LAFD is one of the most common errors on commercial projects. LADBS will not approve a permit until all pre-clearances are recorded in the system.
Zoning Non-Compliance
Plans that don't reflect the parcel's actual zoning requirements: incorrect setbacks, parking ratios, height limits, or lot coverage calculations. These corrections require architectural revisions and full resubmittals.
Title 24 Errors
Energy compliance calculations that don't match LADBS reviewer expectations — using a generic template instead of site-specific inputs — trigger corrections that require revised reports and resubmittal.
Unidentified Overlay Zones
Failing to identify that a project falls within the Coastal Zone, an HPOZ, a Very High Fire Hazard Severity Zone, or a methane hazard zone before submittal. Each overlay adds a separate agency review that must be cleared before permit issuance.
A permit expediter manages every step of the municipal permitting process on your behalf — preparing the application, routing submittals to the correct agencies, tracking plan check status, responding to reviewer corrections, coordinating departmental clearances, and confirming permit issuance. The goal is to compress timelines by eliminating the common errors, routing mistakes, and coordination gaps that cause most permit delays.
Plan check is the review of your project drawings and calculations by LADBS reviewers before your permit is issued and before construction begins. Inspections happen during and after construction, when a city inspector visits the site to verify that work matches the approved plans. Both must be passed before a project is legally complete and a Certificate of Occupancy can be issued.
Yes — property owners and licensed design professionals can submit permit applications directly to LADBS. However, the formatting requirements, routing procedures, plan check expectations, and departmental clearance sequences are specialized knowledge that takes years to develop. Applicants without this experience routinely receive multiple rounds of corrections and experience delays that an expediter would have prevented.
Expediting fees depend on project type, scope, and the number of agencies involved. Simple residential projects may be a flat fee; complex commercial projects or entitlements are typically structured as hourly retainers or phased flat fees. We provide a project-specific proposal after an initial consultation. Expediting fees are almost always recovered — and exceeded — by the time savings on delayed construction starts.
In Los Angeles, building permits are required for any new construction, addition, or alteration that involves structural work, changes to electrical or plumbing systems, changes to the building's use or occupancy, or any work that affects fire safety systems or egress. Some minor repairs and cosmetic work can be done without permits — but the threshold is lower than most property owners expect. When in doubt, a brief consultation with our team can confirm whether your project requires a permit.
Contact our team to discuss your expediting needs and timeline.